The desire to add urban comfort to country life encourages many summer residents, and owners of suburban real estate, to engage in the arrangement of a water supply system on their own site. But full-fledged operation of the water supply system is impossible without a sewage system, right?
It turns out that you can make an autonomous sewage system yourself from improvised materials. One of the popular home-made structures is a drain pit made of tires, used to collect and filter effluents. The device and installation of the structure are very simple, but the efficiency and safety of the operation of the system is achieved only with strict observance of technological standards.
In this article we will talk about how to choose a place for a cesspool, and what you need to take into account. Also, here you will find step-by-step instructions for constructing a cesspool of automobile tires. The material is accompanied by arrangement schemes and videos with expert advice on the construction of drain pits.
The device and principle of operation of the sump
A cesspool is the simplest option for arranging an autonomous sewer. With the advent of highly efficient septic tanks and local purification systems, the use of drain collectors in private households and cottage villages has decreased. However, among summer residents, this method of wastewater removal remains in demand.
The most budgetary and easiest to implement local sewerage system is based on the use of old tires. In this case, the walls of the drain collector are reinforced with rubber tires, the bottom of the tank is missing.
There are two possible options for organizing a drain pit: 1 - an absorbing well without a bottom, designed for processing and disposal of gray effluents and clarified water that has been treated in a septic tank, 2 - a sealed storage tank arranged to collect mixed or brown waste masses. Both methods are simple and affordable.
The base of the absorbing, or otherwise filtering option is a drainage layer of crushed stone and sand. The stability of the structure is achieved due to the weight of the tires themselves, land sprinkling and accumulated wastewater.
In the upper part of the “tower” of tires, the input of the sewer pipeline is provided. The entire structure is covered with a lid that prevents the spread of unpleasant odors and clogging of the pit
The principle of operation of the absorbing hole:
- Sewage through the pipe enters the tank.
- Heavy, solid suspensions settle on the surface of the “pillow” from crushed stone.
- Semi-purified water seeps through the drainage layer and passes deep into the soil.
- The accumulated sludge is periodically pumped out of the tank.
To improve the quality of filtration and accelerate drainage of drains, a hollow perforated pipe is installed inside the tank from the tires.
Part of the wastewater is subjected to double treatment - suspended sediments that are not settled to the bottom are filtered by a drainage pipe and undergo additional treatment in sand and gravel backfill
The desirability of a collection of tires from tires
When planning the construction of a cesspool from car tires, it is necessary to compare the features of the arrangement, the efficiency of the drain collector with the expected operating conditions and the "loads" on the sewer system.
The main arguments in favor of a well made of rubber products:
- Low cost. Used tires can be obtained for free - there are many old tires for recycling at a car service or trucking company. In extreme cases, worn-out car tires will be obtained for almost a penny at a flea market. The main item of expenditure is the arrangement of the supply pipeline.
- Easy installation. Material preparation, installation and connection of a drain tank is a feasible task for one person. The work does not include the use of expensive tools and equipment.
Rubber does not lend itself to corrosion, so the pit will last longer than a structure made of metal barrels. The average life is 10-12 years.
Any car tires with a diameter exceeding 1 meter are suitable for the construction of an absorbing well. The whole process of constructing a drain pit from tires will take 1-2 days
“Artisanal” sewage treatment plant has a number of negative factors limiting its use:
- Slow performance. Even very large tires are not able to provide sufficient volume for the accumulation and disposal of wastewater. An absorbing tire pit is suitable for a family of two to three people.
- Freezing system. Despite the use of heat-insulating materials in severe frosts, the rubber becomes frosty, which is fraught with freezing of drains and stopping the sewage system.
- Bad smell. From time to time from the side of the cesspool, “aromas” of sewage can be heard. To fix the problem, install a fan vent pipe and cover the hatch with a tight lid.
- Limited use. The degree of wastewater treatment by an absorbing pit reaches 40% - this is not enough for safe drainage into the ground. In order not to upset the ecological balance, heavily contaminated liquid and fecal matter cannot be discharged from the tires into the drain pit.
- Lack of tightness. It is quite difficult to ensure complete impermeability of joints between tires. During soil movements and after cleaning, there is a high probability of depressurization of the structure - sewage begins to seep into the soil.
Loss of tightness is the most common cause of a malfunction in the sewer system.
Possible solutions to the problem: overhaul of the structure after cleaning or the complete dismantling of the rubber well, followed by the erection of a trench from new tires.
The accumulated sludge interferes with the normal drainage of wastewater, so the collection must be regularly cleaned. The cleaning process is very time-consuming due to the unevenness of the walls of the tank
It is advisable to erect an absorbing well from tires under the following conditions:
- the volume of sewage does not exceed 1 cubic meter / day;
- the groundwater level on the site is at a depth of 2 m;
- it is preferable to equip a cesspool without a bottom on light, well-drained soils (sand, sandy loam), on heavy substrates (clay) slope water stagnates.
The construction of the pit is advisable for a summer cottage, sauna or seasonal bath.
Choosing a place under the drain pit
When constructing a drain pit, one should be guided by the norms set out in SanPiN 42-128-4690-88. The document clearly defines the permissible boundaries of the placement of the sewer system on the site.
The basic rule when choosing a place is: the distance from the apartment building to the sewage pit should be at least 15 m. Deviation from the standard is possible by agreement with the local SES
Additional, but no less significant, restrictions on the distance of the reservoir with sewage:
- The distance to the water pipes depends on the direction of groundwater movement. You can approximately determine the direction by the slope of the relief. When water rushes from the drain pit, the minimum distance between the designated objects is 40 m, otherwise - at least 25 m.
- The nearest well or deep well with drinking water should be 50 m or more. In practice, compliance with this norm is very difficult. With the permission of the SES, this distance is reduced to 30 m.
- Distance to an open reservoir - at least 30 m.
- The distance between trees, shrubs and a cesspool is 4 m. The same parameter is defined for the roadway.
- The remoteness of the treatment plant from the neighboring site is about 3 meters.
The optimal location of the pit is in the lowlands in the direction of groundwater. To reduce the likelihood of an unpleasant smell penetrating into the housing, a container with sewage is constructed on the leeward side, away from the house.
When planning, it is necessary to ensure unhindered access of cleaning equipment to the cesspool.
The standard length of the hose of the sewer machine is 6 m, while 1.5-2 m will go into the depths of the trench. Modern special equipment is equipped with hoses with a length of 10 m, but its call and work will cost an order of magnitude more
Technology for the construction of a cesspool of tires
Below is a step-by-step instruction on creating a drain hole with a drainage well. The material for arranging the absorbing well is old tires.
The process of constructing a drain structure from old automotive rubber involves a number of traditional steps:
Image Gallery
Photo from
Before constructing a drain pit from tires, we calculate the required volume, according to which we procure the required amount of rubber
Roy pit, given that for the free installation and alignment of the elements you need at least 50 cm around the circumference. Depth taken taking into account 10 cm of a layer of sand used to level the bottom
On the sandy and flattened bottom we lay the starting ring. Then we collect the entire shaft, sequentially installing each of the tires on a pre-laid and aligned tire. We use silicone glue and sealant
From the facility to be equipped (at home, summer kitchen, bath), we lay a sewer pipeline with a slope of 2 cm by 1 m towards the drain pit
At the point of entry of the sewer pipe, a hole is cut out in the wall of the rubber pit. The diameter should ensure a tight fit of the pipe
We cut off the sidewalls of car tires to increase the volume of the well and reduce the area of sites that contribute to the accumulation of sediment. The edges of the tires are “stitched” with polymer ties
At the bottom of the drain pit, we fill the quarry sand with a layer of about 35 - 40 cm. You do not need to compact it and tamp
We fill small gravel with sand with a layer of 40 - 45 cm on sand, then large gravel with a layer of 35 - 40 cm. Using this method, we create a soil filter that performs post-treatment of wastewater
Stage 1: Harvesting tires for the drain pit
Stage 2: Digging a pit for a drain pit from tires
Stage 3: Assembly of the mine from automotive rubber
Step 4: Laying the Pipe to the Drain Pit
Stage 5: Connecting sewer pipes
Step 6: Trimming and securing with ties
Stage 7: Filling the sand component of the soil filter
Step 8: Coarse Filter Fill
Stage # 1. Calculation of the volume of the drain tank
The primary task of constructing an autonomous treatment system from tires is to calculate the volume of the drain tank to determine the number and dimensions of tires used. The volume of the camera depends on the number of people living in the house.
According to regulatory data, one adult spends about 170-200 liters of water per day (for bathing, washing, cooking, etc.). If we take the condition that the family consists of three people, then the daily volume of effluents will be about 600 liters (0.6 cubic meters).
According to technological rules, sewers of this type must accommodate a threefold daily volume of wastewater. The norm is due to the fact that the period of primary decomposition of organic matter, the splitting of sewage in suspension of different fractions is three days
So, the obtained value (0.6 cubic meters) is multiplied by three. In total, the tank capacity should be 1.8 cubic meters. However, for the accuracy of the calculations, the type of soil should be considered. When arranging a cesspool on a porous substrate, the volume of the "rubber" tank can be reduced by 20%. In case of dense soil - increase by 10%.
To calculate the number of tires, you need to determine the volume of one tire. This is easy to do, knowing the diameter and height of the tire.
The tire volume is calculated as the area of its base to a height. The area of the base is the product of the square of the radius and the constant π (3.14)
Stage # 2. Preparation of materials and tools
For independent construction of an absorbing hole and supply of communications to it, one should stock up with tools and materials. Earthwork is carried out using different types of shovels.
Shovel. Thanks to the design of the curved ladle, it is convenient to pick up and remove the earth from the ditch. If the metal sheet of the shovel bends, it can be strengthened with additional sides.
Bayonet shovel. It is used at the beginning of digging, so a tool with a standard length handle (1.5 m) is suitable.
"Digger". Shovel-ripper with a long holder, the design resembles a double fork. The tool is designed for loosening hard layers of soil.
For ease of use at a depth, the shovel is equipped with a long shank (2.5-3 m). It is advisable to make a cross grip on the edge of the handle - it will facilitate the bayonet flipping
Indicative list of materials:
- Tires. Tires from a tractor, truck or car are suitable. At high groundwater it is better to use products of large diameter - it will be possible to obtain the desired volume without deepening to groundwater.
- Crushed stone, gravel and sand. Materials are needed to equip the filter bottom of the tower from tire covers.
- Sewer pipes. For the assembly of the pipeline, two-layer polyethylene or propylene pipes with a diameter of 110 mm are suitable. In addition, you must purchase corrugations, tees, plugs and fittings.
- Cap. A plastic insulated model of the sewer manhole is suitable. The diameter is selected in accordance with the dimensions of the drain pit.
- Film waterproofing and concrete mortar. Materials are necessary to ensure the tightness of the tank - the outer slots of the "pyramid" are coated with a solution, and the inner surface of the walls is lined with a film.
- Plastic or concrete pipe. It deepens into the drainage layer and acts as a filter element.
For installation work you will need: a cutter or jigsaw, tape measure, building level, garden drill, stairs, bucket and rope.
Stage # 3. Sewer pipe outlet
The organization of a local treatment system begins with the arrangement of the outlet. Subsequently, the riser is assembled in the house, the tees and outlet pipes are connected. In an old building, the withdrawal of a sewer pipeline is through an underground or cellar.
If the exhaust channel is not provided in advance in the new house, then you will have to dismantle the floor and make a hole in the foundation.
Next, a trench is prepared leading from the house to the cesspool. It is necessary to ensure a sufficient slope for the drain - at least 1.5-2 cm per linear meter
The depth of the pipeline at the exit from the house should be at least 60 cm, optimally 1 m. If in some areas the depth of the trench is less than 90 cm, then the pipeline must be insulated. Read more about the depth of the sewer pipes below.
Stage # 4. Earthwork
As a pattern for marking the boundaries of the pit, one of the tires is used. The tire must be put in the chosen place and put pegs around the circumference of the circle. In order to further fit the tires freely in the pit, the diameter of the ring must be expanded by 20-40 cm.
At first, it is convenient to dig the earth with a bayonet shovel. The fertile soil layer (the first 50 cm) can be evenly distributed throughout the garden, deeper earth layers can be used for backfilling.
It is easier to continue digging a deep pit with a shovel with a long handle - the compacted soil is loosened with a "digger", then it is collected with a shovel and loaded into buckets. For the descent into the ditch and lifting the filled containers to the surface, a ladder descends into the excavation.
Working together, the digging process can be accelerated and a primitive lifting mechanism can be built - a rope is attached to the buckets.
The pit is additionally deepened by the thickness of the drainage pillow (20-30 cm). The walls of the pit are freed from the roots of the trees, so that as they grow they do not damage or move the tires
For safety, earthwork at a depth should be carried out with a partner. One person is engaged in digging, and the second helps on the surface and insures against the collapse of the walls of the pit. This requirement is especially relevant when arranging a hole in unstable soils.
Stage # 5. Harvesting tires
Concerning the technology for preparing tires for the construction of a cesspool, the opinions of the performers were divided. The first group believes that there is no need to do any manipulations with the tires, since the complete or partial removal of the tread will negatively affect the stability of the segments and the tightness of the structure as a whole.
However, the preservation of the sides of the tires worsens the operation of the absorbing pit - the useful volume of the tank is significantly reduced, and waste accumulates in the formed "pockets" very quickly. At the same time, it is practically impossible to qualitatively clean the sludge from the relief walls - the tank quickly overflows with sewage, and the sewage system fails.
The optimal solution is a partial cut of the rim. On wheels, 5-7 cm lateral ends should be left for fixing with adjacent segments
In one tire, you need to cut a hole to bring the sewer pipe.
Stage # 6. Drainage well formation
At a depth, very often the soil is heavy, clayey, poorly absorbing and moisture-permeable. To increase the absorption area of the waste fluid and improve the efficiency of the absorbing trench, one or more drainage channels are installed.
Work progress:
- Drill a hole as deep as possible with a garden drill - the channel must pass through dense rocks, slowing the outflow of filtered water. The depth of the trench from the bottom of the pit is up to 3-5 m.
- Prepare a pipe corresponding to the length and diameter of the drainage channel. So that the filter pipe does not silt, its upper edge should be 1 m above the base of the drain pit.
- The side walls of the pipe, starting from the top and not reaching 50 cm to the bottom, are drilled. The top of the channel is closed with a fine-mesh polypropylene mesh.
After casing the drainage well, i.e. installation of a perforated pipe into the drilled trunk, a layer of rubble and gravel is poured onto the bottom of the pit - the thickness of the filter pad is about 20-30 cm.
As the output channel, you can use a plastic sewer pipe with a diameter of 110 mm. A more affordable alternative is asbestos cement pipe.
Stage # 7. Tire installation and wall sealing
At the bottom of a kind of mine, the first tire is placed, passing a drainage pipe through it. Similarly, the second tire lowers into the pit, and the sides of adjacent wheels are connected in a convenient way.
Comparing and aligning both tires, it is necessary to make through holes in the protectors. Pass through them a metal wire or plastic clamp, and twist tightly.
During the construction of the tower, the external joints are sealed - the joints of the tires are treated with concrete mortar or bitumen mastic. After setting the mixture, you can begin to backfill the pit.
Fixing and strengthening the walls of the tank from tires in the ground is carried out in different ways: backfilling with a sand-earth mixture, pouring concrete or filling the space with the remaining tires. Vertically stacked tires immobilize the structure
The end face of the last tire should rise slightly above the ground. At the end of laying all the tires, the walls of the tank are covered with water-insulating material from the inside. The most affordable hydrobarrier option is a suitable sealant in composition.
Image Gallery
Photo from
Sewer Pipe Insulation
Sealing connection points
The construction of the neck of the drain pit
Thermal insulation of open areas
Stage # 8. Final arrangement
A small embankment is made along the perimeter of the sides of the finish tire and rammed - a peculiar blind area is obtained, which prevents the penetration of rainwater into the trench. The tank on top is closed with a warmed hatch.
Through the plastic cover you can remove the ventilation pipe. The length of the outer part of the ventilation duct must be at least 60 cm to ensure normal traction.
The cesspool ventilation system solves several problems: access of oxygen to activate aerobic bacteria and removal of gaseous waste products
In order not to degrade the thermal and waterproofing properties of the hatch, the sewer hood can be made in another way. In the closing tire, a hole must be cut out and a “G” -shaped ventilation sleeve with an outlet to be installed. These works are carried out before filling the foundation pit.
In order to prevent clogging of the ventilation duct, flooding or falling into the pit of small animals, a protective umbrella is installed on the pipe
The manufacturing technology of the cesspool of tires from the main and side drainage on the walls:
The device of a homemade drain pit for a summer residence:
The “handicraft” version of the cesspool is simple and accessible in the structure. However, when using it, the risk remains that part of the sewage will go into the ground without filtration, since the design of the tires does not guarantee complete tightness. The construction of an absorbing trench from tires is justified only in rare cases.
Trying to equip a drain pit from car tires yourself, but have any questions during the work? Or maybe they found flaws in the material or is there valuable information that you can share with visitors to our site? Please leave your comments at the bottom of the article.